ARTICLE
BETWEEN-BATCH PROTOCOLS
01. WHY A BETWEEN-BATCH PROTOCOL MATTERS
A between-batch protocol is critical because of roaster thermal inertia. The more precisely the roaster is returned to the same thermal state before every new batch, the more consistently Peak RoR, Drying, Maillard, First Crack, Development, DROP, and the complete roast profile repeat.
The same temperature before CHARGE does not mean the same amount of stored heat in the drum, walls, metal mass, and air circuit. A simple sequence of DROP, then cool down and reheat to Charge Temperature does not guarantee the same starting state from batch to batch.
A repeatable thermal settling and recovery cycle is required between batches. Its purpose is to return the roaster to the same energy state and equalize the stored heat and thermal radiation of the metal structure.
Same CHARGE temperature
≠
same roaster thermal state
- Repeatable Between-Batch Protocol
- repeatable thermal state
- repeatable roast start
02. SCOTT RAO — BETWEEN-BATCH PROTOCOL I
More common
1. Set Gas = 0.
2. DROP the batch and close the door.
3. Let the roaster drift down with zero or low gas until BT reaches the exact chosen Bottoming Temperature.
4. Choose a Bottoming Temperature approximately 20°C below Charge Temperature.
Example: Charge = 175°C; Bottoming Temperature ≈155°C
5. The downward drift to Bottoming Temperature should take approximately 2:30–4:00.
6. At Bottoming Temperature, apply low-to-medium Gas.
7. Raise BT from Bottoming Temperature to Charge Temperature in approximately 1:30.
8. As soon as Charge Temperature is reached — CHARGE.
- DROP
- Gas 0
- Door Close
- Natural Fall
- Charge −20°C
- Low/Medium Gas
- Rise ≈1:30
- Charge Temperature
- CHARGE
03. SCOTT RAO — BETWEEN-BATCH PROTOCOL II
Less common
1. Set Gas = 0.
2. DROP the batch and close the door.
3. Apply low-to-medium Gas.
4. Raise BT to approximately Charge Temperature +10°C.
Example: Charge = 175°C; upper point ≈185°C
5. At the upper point, turn Gas OFF or reduce it to a very low setting.
6. Let BT drift down naturally to Charge Temperature.
7. The downward drift from Charge +10°C to Charge Temperature should take approximately 1:30–2:30.
8. As soon as Charge Temperature is reached — CHARGE.
- DROP
- Gas 0
- Door Close
- Low/Medium Gas
- Charge +10°C
- Gas OFF / Very Low
- Natural Fall 1:30–2:30
- Charge Temperature
- CHARGE
04. DOUBLE COOL-DOWN + CHARGE EQUILIBRIUM
A two-stage thermal settling protocol that finishes at equilibrium at Charge Temperature.
1. DROP. The discharge door is open during unloading and Gas = 0. Close the door as soon as unloading is complete.
2. Set Airflow to a high level. For example, if the maximum airflow is 120 Pa, use approximately 80–90 Pa.
3. After DROP, the empty-roaster temperature first rises naturally because of residual heat in the system, then begins to fall.
4. When temperature falls to approximately Charge Temperature −12…15°C, reduce Airflow to the working value used during roasting. Example: from 80–90 Pa to 60 Pa.
5. After Airflow is reduced, temperature rises again, reaches a second maximum, and then begins a second natural decline.
6. When the second decline reaches Charge Temperature −10…12°C, apply minimum Gas — for example 5–7%. Gas power must be low enough for temperature to rise very slowly to Charge Temperature and then practically stop there, holding the roaster in thermal equilibrium.
7. After Charge Temperature is reached, hold this state for approximately 30 seconds.
8. After stabilization — CHARGE.
- DROP
- Door Open
- Gas 0
- Door Close
- Airflow 80–90 Pa
- first natural rise
- first decline
- Charge −12…15°C
- Airflow 60 Pa
- second rise
- second decline
- Charge −10…12°C
- minimum Gas, e.g. 5–7%
- very slow rise
- Charge Temperature
- thermal equilibrium
- 30 s Hold
- CHARGE